SITE: CONGO
Skema participated in the revamping of the
PMCC switchgears, for the Kitina and ZAP
platforms, offshore in Congo, around 50 km
from Point Noire. The previous switchgears
were supplied by Nuova Q.E.M. Quadri Elettrici
Milano, from which Skema acquired the
expertise, the work order documentation and
spare parts for overall projects, in Italy and
abroad.
This acquisition allows Skema to provide
maintenance, extensions, expansion and
revamping services for low voltage switchgears
supplied by Nuova Q.E.M. thus guaranteeing
operational continuity for installed products.
EPC contractor
Renco

End User
Eni Congo

SOLUTIONS DELIVERED
Skema was awarded the contract for the engineering, manufacturing, commissioning, test
and assistance on site for 7 PMCC Switchgears, in detail:
• 1 Power Center
• 6 Power Motor Control Centers
The switchgears were engineered for the integration with existing switchgears, and were commissioned by Skema’s personnel on site.
Skema is available for documentation consultation, and to provide any additional information
to design, support, provision of spare parts and evaluation of proposed systems that involve
the integration of Skema products with those previously installed by Nuova Q.E.M. Quadri Elettrici Milano.
|