|
Clienti
Progetti
Case history |
| |
HANNIBAL SOUR GAS PROJECT
|
|
|
SITE: TUNISIA The Hannibal Sour Gas Plant located 20 kilometers south of Sfax processes the hydrocarbons brought onshore form the Miskar Gasfield, located 125 kilometres offshore in the Gulf of Gabes, Tunisia. This field is 100% operated by BG Tunisia. Sour gas from ten wells is sent through a pipeline and processed at the Hannibal plant and supplied to the Société Tunisienne de l'Electricité et du Gaz (STEG), Tunisia's state electricity and gas company.
During its lifetime, it is estimated that the Miskar field will produce more than 700 billion cubic feet of gas.
EPC contractor
WorleyParsons

End user
BG Tunisia

SOLUTIONS DELIVERED
LER Modularised Building and Equipment
Skema was awarded the contract for the detailed design, supply and installation of a prefabricated metal Local Equipment Room (LER) fully assembled, wired and tested
in Skema factory in Cesano Maderno, for installation on site.
The LER is composed of:
• Weather-tight enclosure and supporting structure
• Electrical equipment room
• Instrumentation equipment room
• Small power distribution within the building
• HVAC systems
• PA/GA loudspeaker system facilities
• Fire & Gas detection
• CO2 flood system
• PABX Telephone system facilities
• Normal lighting system, including external door lighting
• Escape lighting system on emergency exits and routes
• Cable trays/racks
• Earthing system
• Portable fire extinguishers
Delivery time:28 weeks.
|
|
|