KASHAGAN FIELD DEVELOPMENT
Experimental Programme - Early Works

SITE: KAZAKHSTAN
Kashagan is the largest oil field discovered over the last thirty years worldwide.It is located offshore in the North Caspian Sea about 80 kilometres from Atyrau, and extends over a surface of approximately 75 km by 45 km.
The potential daily average production is 1,2 million barrels. Its development represents one of the greatest current challenges current faced by petroleum industry given the deep, high-pressure reservoir, the high sulphur content, the shallow waters that freeze in winter and wide temperature variations from -30°C to +40°C.

End user
Agip KCO


A consortium comprising


SOLUTIONS DELIVERED
Engineering, manufacturing, testing and commissioning of 6 MV/LV Packaged Substations.
The Substations feed the infrastructure utilities for the Kashagan field and are part of the Early Works of the Kashagan Experimental Programme.

Each Substation was equipped with:
• 10 Kv Switchboards
• PMCC LV Switchboards
• Distribution boards
• Distribution transformers
• AC and DC UPS batteries
• Alarm and communication RTUs
• HVAC system
• Electrical Control System

Delivery time:
15 weeks.