ONSHORE GAS DEVELOPMENT (OGD) III PROJECT

SITE: ADU DHABI, UNITED ARAB EMIRATES

The $1.5 billion Onshore Gas Development (OGD) III Project involves the expansion of the production capacity of a massive gas-processing plant in Habshan, approximately 130 kilometers south-west of Abu Dhabi, in the United Arab Emirates. The Habshan complex is one of the largest gas-processing plants in the world. The expansion was designed to allow it to reach production levels of 125,000 barrels per day of condensate and 12,000 tons per day of LNG, including around 3,200 tons per day of ethane, and also to recycle an amount equal to the volume of gas produced each day back into the reservoir by means of a high-pressure gas injection system.

EPC contractor
Bechtel


End user
Gasco



SOLUTIONS DELIVERED
Skema was awarded the contract for the supply of twenty-one 415V Switchgear systems/MCC’s, including a total of 377 columns and 1571 withdrawable units, as well as the Integrated Protection and Control System (IPCS).

The products supplied by Skema are fully compliant with the most stringent requirements of the Oil and Gas industry, the internationally recognized Shell DEP: internal arc proof, IP 41 external protection, barriers provided in the assemblies to achieve Form 4 separation of compartments, IP 4X internal protection, IP 20 protection when a withdrawable unit has been removed from the assembly, secondary PVC-insulated 600/1000V grade wiring, stranded copper conductors (minimum size 2.5 mm2), bus bar insulation 2kV AC 60 sec, distribution bus bars (droppers) fully segregated by insulated material, contactor and starter units fully withdrawable, withdrawable units which are mechanically identical but electrically different are not interchangeable.

Delivery time: 22 weeks.

“Skema performed very well on this job and I would recommend them to anyone who asked.”
LV Switchgear and IPCS Project Engineer