KARACHAGANAK PROJECT
4th Stabilisation & Sweetening Train

SITE: KAZAKHSTAN
The Karachaganak Field, located in the northwest region of Kazakhstan (about 150 km to the east of the city of Uralsk) is one of the world’s largest oil and gas condensate fields. Covering an area of over 280 square kilometres, it holds more than 1,200 million tonnes of oil and condensate and over 1.35 trillion cubic metres of gas. The expansion of the field has involved an investment of over $ 5.5 billion and it is currently the biggest internationally funded project in Kazakhstan.
The Karachaganak 4th Stabilisation & Sweetening Train Project aims to increase the capacity of the existing Karachaganak Processing Complex (KPC) facilities through the addition of a fourth train.

EPC contractor
Petrofac


End user
Karachaganak Petroleum Operating B.V.(KPO),
a consortium of:


SOLUTIONS DELIVERED
Skema was responsible for the design, manufacturing, supply, inspection, testing, export packing and supervision of testing and commissioning of:
• Intelligent LV Switchgear/Motor Control Centers
• Bus ducts
• RTU
• Integrated Protection and Control System
In total, more than 100 Skema Power Motor Control Center columns were supplied, with more than 300 withdrawable units.

Delivery time:
8 weeks.